Only use this login to access MyHome, MyAgreements or ULiQ. Each option requires a different username and password.

North America
Europe
Denmark
France
Germany
Italy
Netherlands
Poland
Spain
Sweden
Switzerland
U.K.
Latin America
Asia Pacific
Argentina
Brazil
Mexico
Australia
China
Hong Kong
India
Japan
Korea
New Zealand
Singapore
Taiwan
Broader and deeper than ever, UL's third annual global study examines manufacturer and consumer concerns and priorities across a wide range of product-related considerations.

more >
UL is proud to share New Science, a powerful initiative showcasing important ways we are making our world safer through fundamental discovery, testing methodologies, software and standards across five areas.
more >

STANDARDS

Thousands of products and their components are tested to our rigorous requirements every year.

DASHBOARD

UL's Dashboard tools enable businesses to meet evolving marketplace needs by being smarter, more efficient and faster than ever before.

learn more >

LIBRARY

MARKS HUB

SERVICES

STANDARDS

Share

UL and ULC announce important changes to certification programs (Release 12PN-51)

Northbrook, IL - September 12, 2012 - UL has recently conducted research on a wide array of current products and systems originally certified under UL 2196, Tests for Fire Resistive Cables and ULC-S139, Standard Method of Fire Test for Evaluation of Integrity of Electrical Cables and determined that they no longer consistently achieve a two-hour fire-resistive rating when subjected to the standard Fire Endurance Test of UL2196 or ULC-S139.  Consequently, UL and ULC will not be able to offer certification to the currently existing program related to these standards.

As a result, manufacturers are no longer authorized to place the UL mark or ULC mark on the following products:

  • UL Classified Fire Resistive Cable (FHJR)
  • ULC Listed Fire Resistant Cable (FHJRC)
  • UL Listed cable with "-CI" suffix (Circuit Integrity)

Furthermore, UL has removed from its certification directory all Electrical Circuit Protective Systems (FHIT) constructed with Fire Resistive Cable.

For buildings currently under construction, we recognize this change may cause some complications. These referenced systems are only one of several ways that building codes can be satisfied. For additional guidance, visit UL's website below.

UL began certifying these systems under the above referenced standards in 2000.  To date, UL is not aware of any field failures with currently installed systems.  However, if building owners have additional questions pertaining to the adequacy of installed systems and the code requirements at the time of construction, UL recommends they consult with the building designer or a fire protection engineer.

UL will provide research findings to the relevant technical committees (UL 2196 Standards Technical Panel and the ULC Committee on Fire Tests) and will work with these bodies to determine appropriate next steps. Stakeholders who would like to participate in the standard development activities are encouraged to contact the relevant standard committees. Until the technical committees' recommendations are complete, UL has made available an interim certification program for subscribers who wish to certify the above referenced products/systems.  Those interested in the program's details should contact UL's Principal Engineering Manager, Neil Lakomiak at 847-664-2523, Neil.Lakomiak@ul.com

Please visit this section of UL.com for current information: http://www.ul.com/global/eng/pages/offerings/perspectives/regulator/fire/